Introduction to equipment maintenance technology for one-dimensional mixer

Equipment maintenance technology:

1. The barrel of the mixing equipment should avoid hard object knocking to prevent the deformation of the mixing equipment cylinder and affect the smooth operation;

2. The speed reducer should be refueled regularly, and the oil level should be at the center of the oil mark;

3. After the initial operation of the reducer for 300 hours, the lubricant must be replaced * times, and the residual oil should be removed when replacing, and then replaced every 6 months;

4. Fill the bearing with 2# lithium grease, check it every 6 months;

5. The mixing equipment regularly checks and adjusts the tightness of the chain and the V-belt of the mixing equipment, and applies mechanical oil on the chain of the mixing equipment; the operation and maintenance of the low-speed refrigerating centrifuge and the precautions of the pump. The fault of the precision digital pressure gauge is simple and easy to use. How to maintain the single screw pump How to extend the use and maintenance of the high viscosity Roots pump service vibrating screen.

Blood Glucose Test Strips

Glucose Test Strips,Best Blood Glucose Meter,Blood Sugar Test Machine,Glucose Monitoring System

Wuxi BioHermes Bio & Medical Technology Co., Ltd. , https://www.biohermesglobal.com